• Phone: +86-574-86361966
  • E-mail: info@nshpv.com
    • sns03
    • sns04
    • sns06
    • sns01
    • sns02

    Short Lead Time for Hot Water Ball Valve - HOW SERIES DUAL COUNTERBALANCE VALVES FOR OPEN CENTRE – Hanshang Hydraulic

    Short Description:


    Product Detail

    Product Tags

    Related Video

    Feedback (2)

    , , ,
    Short Lead Time for Hot Water Ball Valve - HOW SERIES DUAL COUNTERBALANCE VALVES FOR OPEN CENTRE – Hanshang Hydraulic Detail:

    It provides static and dynamic control of load by regulating the flow IN and OUT of the actuator, through ports C1 and C2.This valve module includes 2 sections, each one composed by a check and a relief valve pilot assisted by pressure in the opposite line: the check section allows free flow into the actuator, then holds the load against reverse movement; with pilot pressure applied at the line across, the pressure setting of the relief is reduced in proportion to the stated ratio until opening and allowing controlled reverse flow. Back-pressure at V1 or V2 is additive to the pressure setting in all functions.

    Technical data

    Model HOW-3/8-50 HOW-1/2-80 HOW-3/4-120 HOW-1-160
    Flow Range (l/min) 50 80 120 160
    Max.Peak Pressure (MPa) 31.5
    Pilot Ratio 4.3:1 4.3:1 6.8:1 3:1
    Valve body(Material)Surface treatment (Steel body)Surface clear zinc plating
    Oil cleanliness NAS1638 class 9 and ISO4406 class 20/18/15

    Installation Dimensions

    555

    666


    Product detail pictures:

    Short Lead Time for Hot Water Ball Valve - HOW SERIES DUAL COUNTERBALANCE VALVES FOR OPEN CENTRE – Hanshang Hydraulic detail pictures


    Related Product Guide:
    About Hydraulic Valves
    All About Hydraulic Check Valves

    Short Lead Time for Hot Water Ball Valve - HOW SERIES DUAL COUNTERBALANCE VALVES FOR OPEN CENTRE – Hanshang Hydraulic, The product will supply to all over the world, such as: , , ,

  • 5 Stars By from -

    5 Stars By from -
    Write your message here and send it to us
    WhatsApp Online Chat !